Customization: | Available |
---|---|
Type: | Buggy/Golf Carts |
Seats: | ≥5 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The power of the golf cart redefines the national car,The outstanding appearance and outstanding driving and riding feeling into one.
Model | HKEV-GM22 | ||||||
Dimensions |
2910*1350*2200mm
|
||||||
Passengers Capacity | 2+2 seats | ||||||
Speed | <=40Km/h | ||||||
Max. driving range | 80-100KM | ||||||
Max. driving slope | <=30% | ||||||
Turning Radius | 4.5M | ||||||
Ground Clerance | 136MM | ||||||
Brake Distance | <=4M | ||||||
Wheelbase | 2400MM | ||||||
Front/Rear Tread | 870MM | ||||||
Curb Weight | 580KG | ||||||
Motor | AC, 48V, 5KW | ||||||
Controller | Enpower brand | ||||||
Electronic control | AC controller with anti-free battery | ||||||
Battery type | 48V 150AH,6pcs Lead Acid Battery | ||||||
Charger | 60V-220V, intelligent high-frequency car charger | ||||||
Charging time | 8hours | ||||||
Steering system | Rack and pinion steering gear | ||||||
Braking system | Self-adjusting, rear wheel mechanical drum,Foot operated parking | ||||||
Front axle and suspension | Leaf spring front suspension | ||||||
Rear axle and suspension | Integral rear axle | ||||||
Tire | 22X9.50-10,off road tire with aluminum alley rim | ||||||
Dash board | Electricity meter, forward and backward switch | ||||||
Seat | Bus cold foam sponge + high resilience PU leather fabric | ||||||
Body material | Steel frame + ABS engineering plastic molding material | ||||||
Color | Red Green Blue White Orange |
Q1. What is your terms of packing?
A: Generally, we pack out goods in containers by iron frame. If you have special requirement we can follow.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: It takes about 30 days after receiving your advance payment.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: Since this product is high-value product, we can accept sample by discount. Should the production be large in quantity, we may even consider re-funding for the sample.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.